Fraserburgh-Inverallochy Path bridge is fabricated by Edwards Engineering
- Aberdeenshire Council
- Scotland
- Open procedure, 4 bids
- 2 February 2026 to 31 March 2026
Aberdeenshire Council hired Edwards Engineering to fabricate an active travel bridge for the Fraserburgh-Inverallochy Path over the Water of Philorth.
The work had to be finished by 31 March 2026, the end of the 2025-2026 financial year. The bridge was to be braced temporarily and assembled in a single piece or two, then taken to a store no more than 5 miles from Fraserburgh. Laying the GRP was left to others. Prices were based on a Thermal Sprayed Aluminium (TSA) coating, not galvanising.
Bids were judged on price and on quality, which covered method statements on organisation and management and on fabrication and non-destructive testing. Four bids came in, and the award was £117,203.
- What
- Bridges and highway structures
- Supplier
- Edwards Engineering
- Value
- £117,203
- How it was bought
- Open procedure
- 4 bids
- Dates and next
- Feb 2026 to Mar 2026