Brampton Pump House remediation: Amey wants a subcontractor for the DIO
- Amey
- Scotland
- Open procedure (below threshold)
- 30 November 2026 to 29 January 2027
Amey wants a subcontractor to repair the pumping station at Brampton Pump House. Amey is doing the work for the DIO through the FDIS, in its Central Region. It has asked firms to express interest first.
An inspection found problems with the pumps, the incoming power supply, safe access and water getting in. Both pumps must come out for inspection and the wet well needs repairs. The firm would also fix the power supply, stop groundwater getting in and design a permanent safe way in. Inlet No. 2 needs investigating. Firms must quote for every part of the work.
Firms must be verified members of Constructionline (G), comply with DefStan 05-138, work in BIM Level 2 and be willing to act as main contractor. Amey estimates the work at £113,000 for a two-month contract from November 2026.
- What
- Pumping stations and small treatment plants
- Buyer
- Amey
- Estimated value
- £113,000
- How it will be bought
- Open procedure (below threshold)
- Responses due
- Not published
- Contract dates
- Nov 2026 to Jan 2027