Aberkenfig Library refurbishment design lead for Awen Cultural Trust
- Awen Cultural Trust
- Wales
Awen Cultural Trust wants a principal designer and project lead to plan the refurbishment of Aberkenfig Library and manage the works that follow. The goal is a modern library and community hub, delivered within the timescales of the Welsh Government's Transformation Capital Grant scheme.
The lead would act as principal designer under CDM 2015 and coordinate an architect, a structural engineer, a building services engineer and a cost consultant. The design would replace the windows and swap the gas boiler for an air-source heat pump, with solar PV panels and battery storage added. Inside, it would add a Changing Places-type toilet, a unisex public toilet, a meeting room for about 8 to 10 people and a small confidential room.
The trust has published no estimate. The deadline for bids is 4 December 2026.
Closes in 12 days· 4 Dec 2026
- What
- Multidisciplinary design team
- Buyer
- Awen Cultural Trust
- Estimated value
- Not published
- How it is being bought
- Not published
- Bids due
- 4 Dec 2026
- Contract dates
- Not published