Lura Constructions delivers SHDF 2.1 retrofit works for The Barnet Group
- The Barnet Group
- London
- Limited
- 21 February 2026 to 31 March 2026
The Barnet Group awarded wave 2.1 of its SHDF works to Lura Constructions Ltd, a small business.
Solar PV and the roofing to go with it sat alongside external, cavity and internal wall insulation and loft insulation. The work also took in ventilation, heating controls such as TRVs and hot water cylinder jackets, and the structural alterations and general repairs needed for the measures.
The contract was worth £624,000 and was due to end in March 2026.
- What
- Domestic whole-house retrofit programmes
- Buyer
- The Barnet Group
- Supplier
- Lura Constructions Ltd
- Value
- £624,000
- How it was bought
- Limited
- Dates and next
- Feb 2026 to Mar 2026