Contract awardedReservoir and dam engineering

Mott MacDonald designs a draw-off chamber at Langold Lake for Bassetlaw

Bassetlaw District Council hired Mott MacDonald to design a new draw-off chamber at Langold Lake and manage the project. A statutory Section 10 reservoir inspection had recommended the work.

The chamber is meant to keep the lake's water control works safe and compliant with regulations. The award was £30,000, and the contract runs from November 2025 to November 2026.

Alert me to similar tenders

Contract ends November 2026

What
Reservoir and dam engineering
Value
£30,000
How it was bought
Not published
Dates and next
Nov 2025 to Nov 2026

How it was bought

1 official notice
  1. 25 Nov 2025Contract starts
  2. 8 Dec 2025Award noticeFind a Tender
  3. 25 Nov 2026Contract ends

How it compares

With every reservoir and dam engineering award since 2021

Half of awards fall between £48,747 and £185,448Median £100,727

Awards
77
Firms that won them
20
Median award
£100,727
of 77 with a value
This award
Smaller than 87%
of them
Typical length
1 year
In East Midlands
7 awards

Mott MacDonald ranks 1st of 20 firms for reservoir and dam engineering awards since 2021.

RankFirmAwardsValue
1Mott MacDonald Won this one15£1.62m
2Locked11£2.52m
2Locked11£2.03m
4Locked9£986,439
5Locked6£624,882
6Locked4£337,889
See who wins this work

Figures to 21 November 2026

Reservoir and dam engineering at other buyers

Bassetlaw District Council has awarded 170 contracts since 2021.