WSP takes on engineering work on Cleveland Bridge's passive bearings
- Bath & North East Somerset Council
- South West
- Open procedure
- 27 July 2026 to 30 September 2026
Bath & North East Somerset Council hired WSP for work on the passive bearings of Cleveland Bridge.
WSP's role was consultancy, covering both the engineering and the inspection side of the bearings work. The council set the job at about two months. The £20,000 contract ran from July 2026 and was due to end in September 2026.
- What
- Bridge and structures inspection, assessment and design
- Supplier
- WSP
- Value
- £20,000
- How it was bought
- Open procedure
- Dates and next
- Jul 2026 to Sep 2026