Contract awardedGroundworks, enabling works and site infrastructure

Dave Lucey builds a haul road for Bath Spa University's Corston demolition

Bath Spa University hired Dave Lucey Ltd to carry out groundworks and build a temporary haul road. The road gave access for the demolition works at Corston.

The university chose the contractor after a limited competition. The work was short: the £62,544 contract ran from May 2026 and was due to end in June 2026.

What
Groundworks, enabling works and site infrastructure
Value
£62,544
How it was bought
Below threshold - limited competition
Dates and next
May 2026 to Jun 2026

How it was bought

1 official notice
  1. 18 May 2026Contract starts
  2. 5 Jun 2026Contract ends
  3. 12 Aug 2026Award noticeFind a Tender

How it compares

With every groundworks, enabling works and site infrastructure award since 2021

Half of awards fall between £76,158 and £1.35mMedian £300,000

Awards
607
Firms that won them
550
Median award
£300,000
of 563 with a value
This award
Smaller than 78%
of them
Typical length
5 months
In South West
56 awards

Dave Lucey Ltd ranks 107th of 550 firms for groundworks, enabling works and site infrastructure awards since 2021.

RankFirmAwardsValue
1Locked7£10.9m
1Locked7£4.28m
1Locked7£4.27m
4Locked6£28.2m
4Locked6£16.1m
4Locked6£9.74m
107Dave Lucey Ltd Won this one1£62,544
See who wins this work

Figures to 21 November 2026

Groundworks, enabling works and site infrastructure at other buyers

Bath Spa University has awarded 228 contracts since 2021.

See Bath Spa University's page
  • Dave Lucey Ltd has won 6 public contracts since 2021, 3 of them from Bath Spa University.

    • Aug 2026This purchase£62,544
    • Jul 2025Locked£174,129
    • Feb 2024Locked£80,460
    See the contracts

2 groundworks, enabling works and site infrastructure tenders are open now

See them
More groundworks, enabling works and site infrastructure contracts awarded in 2026