Timeline Television wins Bath Spa University's TV studio refurbishment
- Bath Spa University
- South West
- Competitive flexible procedure, 4 bids
- 15 June 2026 to 31 October 2026
Bath Spa University hired Timeline Television as systems integrator to refurbish its TV studios at Newton Park Campus. The studios dated from 2013.
Timeline was to deliver the whole multicamera system, from design to commissioning, and maintain it. The refit covered nine edit suites, two audio mixing studios, two production studios, a gallery and a central apparatus room. The university planned to move from a five-camera SDI setup to an IP backbone built on SMPTE ST 2110. The studios had to be ready for teaching by September 2026.
The open tender scored quality at 75% and cost at 25%. Of four bidders, Timeline won in May 2026 at £2,157,702, on a first term to October 2026 with yearly extensions possible.
- What
- Broadcast, studio and stage production systems
- Buyer
- Bath Spa University
- Supplier
- Timeline Television
- Value
- £2.16m
- How it was bought
- Competitive flexible procedure
- 4 bids
- Dates and next
- Jun 2026 to Oct 2026
- Option to Sep 2036