Site masterplan for The Brit School in Croydon goes to Stride Treglown
- The Brit School Limited
- London
- Open, 67 bids
- 1 June 2026 to 31 May 2027
The Brit School Limited hired Stride Treglown to plan the future of its site in Croydon and produce designs for a funding campaign.
The performing and creative arts school lacks space for its courses and performances, and wants a site plan for the next 20 years or more. Its early list of needs includes extra large rehearsal space, more music practice rooms and removing or replacing The Hut, a 1950s building. A possible new build has a budget of £5m to £20m.
Stride Treglown's work is likely to run in three phases, from feasibility options for the current site to RIBA Stage 2 concept designs and material for fundraising. Building work would be tendered separately. The tender drew 67 bids, and the main stage was weighted 70% on quality and 30% on price. The £126,000 contract runs to May 2027.
Contract ends May 2027
- What
- Masterplanning, urban design and design codes
- Supplier
- Stride Treglown
- Value
- £126,000
- How it was bought
- Open
- 67 bids
- Dates and next
- Jun 2026 to May 2027