Solar panels at three sites: Broads Authority wants a PV installer
- Broads Authority
- East of England
- Below threshold - open competition
- 11 January 2027 to 31 March 2027
The Broads Authority wants solar PV panels fitted at three of its sites, from the first survey through to commissioning. The sites are Hoveton TIC, Ranworth TIC and Great Yarmouth Yacht Station.
The contractor would design the installation, build the electrical and civil works around it, and connect and test it. The result must be a renewable energy system that is fully working and compliant. Price counts for 60% of the score and quality for 40%. The authority marks the tender as suitable for small businesses.
The estimate is £75,000. The deadline for bids is 11 December 2026. The work is due to start in January 2027 and can run to April 2027 with a one-month extension.
Closes in 19 days· 11 Dec 2026
- What
- Solar PV and battery storage
- Buyer
- Broads Authority
- Estimated value
- £75,000
- How it is being bought
- Below threshold - open competition
- Bids due
- 11 Dec 2026
- Contract dates
- Jan 2027 to Mar 2027
- Option to Apr 2027