Class 357 train refurbishment and systems upgrade planned by c2c
- C2C Railway Limited
- 18 September 2027 to 17 September 2029
C2C Railway Limited plans to refurbish and upgrade its Class 357 fleet, the 74 vehicles it runs across the Essex Thameside network. The aim is to bring the units closer to what passengers and the operator will expect in future.
Possible work could include more reliable air conditioning, automatic passenger counting, CCTV and passenger information screens. Interiors could also be covered, from floors and seats to toilets and panels, along with power at seats and in the cabs. c2c also wants views on whether a modern in-cab system would give better value than its platform-based DOO equipment, as platform cameras and mirrors near obsolescence.
c2c has published no estimate. It asked for the market's views by 18 September 2026, and the seven-year contract could run to September 2036 with extensions.
- What
- Rolling stock maintenance, overhaul and spares
- Buyer
- C2C Railway Limited
- Estimated value
- Not published
- How it will be bought
- Not published
- Responses due
- 18 Sep 2026
- Contract dates
- Sep 2027 to Sep 2029
- Option to Sep 2036