JML Contracts rebuilds Annick Water riverbank wall in Dreghorn for Cairn
- Cairn Housing Association Ltd
- Scotland
- Open procedure, 3 bids
- 1 June 2026 to 30 September 2026
Cairn Housing Association Ltd hired JML Contracts Ltd to restore the eroded southern bank of the Annick Water beside Annick Drive in Dreghorn. The job includes rebuilding the 61m gabion basket wall that holds the bank back. It was let as design and build, with ecological assessments, flood risk reports and ground investigation data provided.
Three bids came in through an open tender. The works were planned to run from June to September 2026. No contract value was published.
- What
- Retaining walls, slope stabilisation and land hazard works
- Supplier
- JML Contracts Ltd
- Value
- Not published
- How it was bought
- Open procedure
- 3 bids
- Dates and next
- Jun 2026 to Sep 2026