River Dee pearl mussel surveys go to the James Hutton Institute
- Cairngorms National Park Authority
- Scotland
- Open procedure, 2 bids
Cairngorms National Park Authority paid The James Hutton Institute £58,201 for freshwater pearl mussel surveys on the River Dee, almost twice its £30,000 estimate.
The mussels left in the main river now cling to the edges of the riverbed, where floods and drought threaten them. The institute was to revisit the 17 remaining Site Condition Monitoring sites and two more. It would record the age spread of the mussels, signs of young ones and the state of the habitat. It would also study LiDAR data to find refuge sites in the tributaries, as a safeguard against another large flood. The results were to feed a NatureScot study on how best to recover the population.
Two bids came in through an open tender. The six-month contract carried an option to extend it for a summer survey in 2026.
- What
- Protected species and bird surveys and mitigation
- Supplier
- The James Hutton Institute
- Value
- £58,201
- How it was bought
- Open procedure
- 2 bids
- Dates and next
- 12 Nov 2025