Cambridgeshire County Council hired WSP for the Stage 2 detailed design of Cambridge Eastern Access, on the stretch from the Chisholm Trail to Airport Way.
The commission covered the technical engineering and consultancy needed to take that section of the transport scheme through its second design stage.
The council ordered the work through the Cambridgeshire and Peterborough Joint Professional Services Framework. The £1,240,888 call-off ran from February 2025 and was due to end in September 2025.
- What
- Highway and traffic engineering design
- Supplier
- WSP
- Value
- £1.24m
- How it was bought
- Call-off, LGSS on behalf of Cambridgeshire County Council
- Dates and next
- Feb 2025 to Sep 2025