Contract awardedSolar PV and battery storage

Solar panels for Cyncoed Campus D Block come from Alt-Solar

Cardiff Metropolitan University hired Alt-Solar Limited to provide and fit solar photovoltaic panels at D Block, on the university's Cyncoed Campus. Alt-Solar's job was a one-off installation, planned to take two months.

The university awarded the £70,600 contract after a limited competition. Work started in August 2026 and was due to finish in September 2026.

What
Solar PV and battery storage
Value
£70,600
How it was bought
Below threshold - limited competition
Dates and next
Aug 2026 to Sep 2026

How it was bought

1 official notice
  1. 6 Jul 2026Award noticeFind a Tender
  2. 1 Aug 2026Contract starts
  3. 30 Sep 2026Contract ends

How it compares

With every solar PV and battery storage award since 2021

Half of awards fall between £68,459 and £577,500Median £185,829

Awards
737
Firms that won them
377
Median award
£185,829
of 672 with a value
This award
Smaller than 74%
of them
Typical length
5 months
In Wales
66 awards

Alt-Solar Limited ranks 83rd of 377 firms for solar PV and battery storage awards since 2021.

RankFirmAwardsValue
1Locked24£5.53m
2Locked15£2.78m
3Locked14£39m
4Locked13£5.23m
5Locked12£2.41m
5Locked12£1.91m
83Alt-Solar Limited Won this one2£2.79m
See who wins this work

Figures to 25 November 2026

Solar PV and battery storage at other buyers

Cardiff Metropolitan University has awarded 124 contracts since 2021.

See Cardiff Metropolitan University's page
  • Alt-Solar Limited has won 2 public contracts since 2021.

4 solar PV and battery storage tenders are open now

See them
More solar PV and battery storage contracts awarded in 2026