Hydrospec replaces pool filter media at Castle Point's Runnymede centre
- Castle Point Borough Council
- East of England
- Limited, 1 bid
- 22 January 2026 to 31 January 2026
Castle Point Borough Council hired Hydrospec Limited to replace the filter media in the pool filtration system at Runnymede Leisure Centre. The job meant taking out and disposing of the old media, then supplying and fitting new material to keep the pool water within quality standards.
The council awarded the £41,117 job directly, and the contract was due to end in January 2026.
- What
- Swimming pool plant and pool maintenance
- Supplier
- Hydrospec Limited
- Value
- £41,117
- How it was bought
- Limited
- 1 bid
- Dates and next
- Jan 2026 to Jan 2026