Marine Science Support maintains Cefas reservoirs at Hinkley Point C
- Cefas
- South West
- Single tender action (below threshold)
- 1 January 2026 to 31 December 2026
Cefas pays Marine Science Support Ltd to maintain and monitor the artificial bunded reservoirs on the Hinkley Point C foreshore. Cefas designed the reservoirs to replace water that no longer reached protected intertidal algal mats. The drainage there was cut when a walking jack-up barge crossed the rocky shore while being used to build an aggregates jetty.
There are four reservoir schemes, each made up of one to seven reservoirs that fill as the tide rises and release water slowly as it falls. On ad hoc visits, field teams clear sediment by hand, gauge each outlet's flow by weighing water caught over a timed period, and remove or refit the telemetric depth gauges.
Cefas awarded the £40,000 contract directly, as a contract extension. It runs from January to December 2026.
Contract ends December 2026
- What
- Water quality and hydrometric monitoring
- Buyer
- Cefas
- Supplier
- Marine Science Support Ltd
- Value
- £40,000
- How it was bought
- Single tender action (below threshold)
- Dates and next
- Jan 2026 to Dec 2026