Highgate Wood gets new outdoor gym kit from Wicksteed Leisure
- City of London Corporation
- London
- Direct
- 1 March 2026 to 31 March 2026
The City of London Corporation hired Wicksteed Leisure Limited to replace the outdoor gym equipment on the playing field at Highgate Wood.
Wicksteed Leisure, a small business, was to take out the old equipment and fit new gym kit with fresh safety flooring.
The corporation awarded the £35,949 contract directly, without a tender. The work was due to run through March 2026.
- What
- Outdoor gym and fitness equipment
- Supplier
- Wicksteed Leisure Limited
- Value
- £35,949
- How it was bought
- Direct
- Dates and next
- Mar 2026 to Mar 2026