Trevithick Court windows and doors: The Cornwall College Group plans works
- The Cornwall College Group
- South West
- Open procedure (below threshold)
- 13 April 2027 to 3 September 2027
The Cornwall College Group plans to replace the doors and windows in the courtyard corridor of Trevithick Court, at its Camborne campus. The existing structure is timber, and some of its pillars and frame members carry the roof. The contractor would prop the structure while rotten sections are repaired or replaced, and would bring in and manage a structural engineer.
One local contractor, based within two hours' normal travel, would design, supply and fit everything as Principal Designer and Principal Contractor. The work will not be split. The works must be done during the college's summer break in 2027.
The project is estimated at about £100,000 to £125,000. The group expects to go out to tender in January 2027.
- What
- Window and external door replacement
- Estimated value
- £125,000
- How it will be bought
- Open procedure (below threshold)
- Responses due
- Not published
- Contract dates
- Apr 2027 to Sep 2027