Contract awardedMultidisciplinary design team

Emergency Department Phase 3/4 design for CUH goes to LSI Architects

Cambridge University Hospitals NHS Foundation Trust hired LSI Architects, a small business, as the multi-disciplinary design team for its Emergency Department Phase 3/4 project.

The scope takes the design as far as RIBA Stage 4 and the pre-tender estimate. It covers architecture and engineering design.

The £89,951 contract runs from September 2026 to September 2027.

Alert me to similar tenders

Contract ends September 2027

What
Multidisciplinary design team
Value
£89,951
How it was bought
Below threshold - unknown
Dates and next
Sep 2026 to Sep 2027

How it was bought

1 official notice
  1. 4 Sep 2026Award noticeFind a Tender
  2. 4 Sep 2026Contract starts
  3. 3 Sep 2027Contract ends

How it compares

With every multidisciplinary design team award since 2021

Half of awards fall between £83,493 and £643,370Median £222,620

Awards
1,065
Firms that won them
486
Median award
£222,620
of 971 with a value
This award
Smaller than 74%
of them
Typical length
1.5 years
In East of England
58 awards

LSI Architects ranks 41st of 486 firms for multidisciplinary design team awards since 2021.

RankFirmAwardsValue
1Locked69£81.5m
2Locked30£13.6m
3Locked27£52.9m
4Locked25£10.5m
5Locked20£19.7m
6Locked19£14.6m
41LSI Architects Won this one4£230,291
See who wins this work

Figures to 25 November 2026

Multidisciplinary design team at other buyers

Cambridge University Hospitals NHS Foundation Trust has awarded 812 contracts since 2021.

See Cambridge University Hospitals NHS Foundation Trust's page
  • LSI Architects has won 24 public contracts since 2021.

9 multidisciplinary design team tenders are open now

See them
More multidisciplinary design team contracts awarded in 2026