Thistle Design (MMC) supplies Defence Equipment and Support with 200 wiper motor assemblies for the commander's cupola on Challenger 2 and 3 tanks. One hundred are left-hand and one hundred right-hand. They are built to a technical drawing pack for the Challenger 3 manufacturing phase and delivered to the Donnington Fulfillment Centre.
The contract was awarded directly in September 2026. The firm is the design authority and original equipment manufacturer of the motor, and it also repairs the assemblies. No other supplier was judged to have the expertise needed.
The first notice expected about £2.4m. Later notices give £1,951,000 and run the contract to September 2029.
Contract ends September 2029
- What
- Vehicle parts, consumables and stores management
- Supplier
- Thistle Design (MMC) Limited
- Value
- £2.4m
- How it was bought
- Direct award
- Dates and next
- Oct 2026 to Sep 2029