Ruane updates IMO lighting schematics for the Department for Transport
- Department for Transport
- London
- Single tender action (below threshold)
- 14 April 2025 to 23 June 2025
The Department for Transport hired Ruane Construction Design and Consultancy Ltd to bring the IMO lighting schematics up to date. The short consultancy job covered revisions to existing electrical design records and the technical documents that went with them.
The department awarded the £26,539 contract directly, without a competition. The work ran from April 2025 and was due to end in June 2025.
- What
- Lighting design, assessments and lighting asset surveys
- Value
- £26,539
- How it was bought
- Single tender action (below threshold)
- Dates and next
- Apr 2025 to Jun 2025