TX2 transformer for DVLA's Morriston site comes from J&P
- Driver and Vehicle Licensing Agency
- Wales
- Direct
- 19 May 2026 to 18 May 2027
The Driver and Vehicle Licensing Agency (DVLA) is replacing a failed transformer at its Morriston site, with J&P Intelligent Solutions for Power doing the work. The failed unit, TX2, was a secondary transformer. The supplier is also renewing old high and low voltage cabling, including the cables to the existing transformer, to make the estate's supply more resilient.
The new unit is a like-for-like match for the original TX2, so the system stays uniform and easier to maintain. It is a 1000 kVA oil-filled unit that steps 11,000 V down to 415 V, using Midel 7131 natural ester as its insulating liquid. It must fit inside the existing A Block Transformer House.
DVLA awarded the £189,925 contract directly in April 2026, and it runs to May 2027.
Contract ends May 2027
- What
- HV and LV distribution, switchgear and substations
- Value
- £189,925
- How it was bought
- Direct
- Dates and next
- May 2026 to May 2027