East Riding of Yorkshire Council had sustainable drainage fitted at Penshurst Primary School. The job was phase 4 of the council's school sustainable drainage work.
The aim was to make the school buildings less likely to flood. The new drainage was designed to slow surface water before it ran into the existing Yorkshire Water system.
PBS Construction (North East) Ltd, a small business, was awarded the £85,118 contract in July 2026. The work was due to end in September 2026.
- What
- Drain clearance, CCTV surveys and drain repairs
- Value
- £85,118
- How it was bought
- Other -
- Dates and next
- Jul 2026 to Sep 2026