EV charge point network: East Sussex County Council plans a concession
- East Sussex County Council
- South East
- Open procedure
- 26 April 2027 to 25 April 2042
East Sussex County Council plans a concession for a public electric vehicle charging network, which the operator would install, run and maintain. Most charge points will be on-street, for residents who cannot park off the street.
The council wants at least 1,590 standard charge points of up to 7.9kW and 20 rapid ones of 50kW to 149kW. The operator must cover the council's mandatory sites and may propose more sites and a different mix. It would earn its income from charging tariffs, helped by a £4.441m subsidy from the Local Electric Vehicle Infrastructure (LEVI) Fund.
The council estimates the concession's value at between £160m and £830m, depending on how many charge points the winning bid includes. The term is 15 years, with two one-year extensions that could take it to April 2044.
Due in 68 days· 29 Jan 2027
- What
- Public EV charging network concessions
- Estimated value
- £691.7m
- How it will be bought
- Open procedure
- Responses due
- 29 Jan 2027
- Contract dates
- Apr 2027 to Apr 2042
- Option to Apr 2044