Air source heat pump installation planned by Eastlight Community Homes
- Eastlight Community Homes
- East of England
- 1 September 2027 to 31 August 2030
Eastlight Community Homes plans to hire a contractor to fit air source heat pumps across its housing. Each job would run from a survey and suitability check through design to installation and commissioning. Old heating systems would come out, possibly including oil boilers, and electrics and hot water cylinders may need upgrading.
The homes range from houses and maisonettes to flats and supported or sheltered housing, both occupied and empty. The contractor would also deal with residents, certify and hand over each system, and provide aftercare and performance monitoring. PV and roofing installations fall within the scope too. The work supports Eastlight's decarbonisation and carbon reduction aims.
The work is estimated at £2.5m. Eastlight expects a three-year contract from September 2027, with an option to extend by two years.
- What
- Heat pumps
- Estimated value
- £2.5m
- How it will be bought
- Not published
- Responses due
- 20 Oct 2026
- Contract dates
- Sep 2027 to Aug 2030