Contract awardedPower and utility network engineering

Ebbsfleet Gateway cable diversion design goes to UK Power Networks

Ebbsfleet Development Corporation hired UK Power Networks to survey and design the diversion of existing power cables at Ebbsfleet Gateway.

UK Power Networks carries out the surveys and produces the detailed design for moving the cables. The corporation needs them moved to make way for development at the site.

The corporation awarded the £194,199 contract directly in June 2026. It is due to end in November 2026.

Alert me to similar tenders

Contract ends November 2026

What
Power and utility network engineering
Value
£194,199
How it was bought
Direct award
Dates and next
Jun 2026 to Nov 2026

How it was bought

1 official notice
  1. 5 Jun 2026Award noticeFind a Tender
  2. 5 Jun 2026Contract starts
  3. 29 Nov 2026Contract ends

How it compares

With every power and utility network engineering award since 2021

Half of awards fall between £45,102 and £388,027Median £132,337

Awards
75
Firms that won them
41
Median award
£132,337
of 52 with a value
This award
Bigger than 62%
of them
Typical length
8 months
In South East
6 awards

UK Power Networks ranks 2nd of 41 firms for power and utility network engineering awards since 2021.

RankFirmAwardsValue
1Locked4£467,813
2Locked3£4.56m
2Locked3£1.14m
2Locked3£750,000
2UK Power Networks Won this one3£425,199
2Locked3£279,651
See who wins this work

Figures to 21 November 2026

Power and utility network engineering at other buyers

Ebbsfleet Development Corporation has awarded 49 contracts since 2021.