Bembridge and Ashey homes get flood resilience fitted by M3 Floodtec
- Environment Agency
- South East
- Call-off
- 27 February 2026 to 27 November 2026
The Environment Agency is paying for flood resilience measures at six homes in Bembridge and Ashey. The homes fall within the Isle of Wight Flood Resilience Scheme, and each gets measures planned around its own site.
The agency ordered the detailed design and installation from M3 Floodtec, a small business, through lot 2 of its property flood resilience framework, PFR2. The £85,746 contract runs from February 2026 to November 2026.
Contract ends November 2026
- What
- Property flood resilience
- Buyer
- Environment Agency
- Supplier
- M3 Floodtec
- Value
- £85,746
- How it was bought
- Call-off, PFR2
- Dates and next
- Feb 2026 to Nov 2026