AtkinsRéalis designs the Egremont SuDS scheme for the Environment Agency
- Environment Agency
- North West
- Call-off
- 16 March 2026 to 13 November 2026
The Environment Agency ordered the detailed design of a SuDS (sustainable drainage) scheme at Egremont from AtkinsRéalis.
The work covered the civil engineering design for drainage that controls surface water runoff and lowers flood risk at Egremont.
The agency placed the order through the Crown Commercial Service Construction Professional Services framework (RM6165). The £67,586 contract started in March 2026 and was due to end in November 2026.
- What
- Flood risk, drainage and coastal engineering
- Buyer
- Environment Agency
- Supplier
- AtkinsRéalis
- Value
- £67,586
- How it was bought
- Call-off, Crown Commercial Service
- Dates and next
- Mar 2026 to Nov 2026