Debris screen design for the Environment Agency goes to JBA Consulting
- Environment Agency
- South East
- Call-off from a framework agreement
- 8 September 2025 to 8 September 2027
JBA Consulting is designing lower risk debris screens for the Environment Agency. The work falls under CDF Lot 1 and covers engineering design and construction consultancy for flood risk infrastructure.
The agency ordered the work as a call-off from a framework. The £2m contract runs for two years, from September 2025 to September 2027.
Contract ends September 2027
- What
- Flood risk, drainage and coastal engineering
- Buyer
- Environment Agency
- Supplier
- JBA Consulting
- Value
- £2.05m
- How it was bought
- Call-off from a framework agreement
- Dates and next
- Sep 2025 to Sep 2027