Contract awardedHeat pumps

Penryn Sports Centre heat pumps contract went to ZLC Energy

Falmouth Exeter Plus (FXPlus) hired ZLC Energy to design and install air source heat pumps at the Penryn Campus Sports Centre.

The project formed part of decarbonisation works at the centre. FXPlus wanted one contractor to handle both the design and the installation, along with the enabling works.

ZLC Energy was chosen after an open tender. The £270,000 contract was due to run from July to September 2026.

What
Heat pumps
Supplier
ZLC Energy
Value
£270,000
How it was bought
Open procedure
Dates and next
Jul 2026 to Sep 2026

How it was bought

1 official notice
  1. 29 Jun 2026Bids closed
  2. 16 Jul 2026Award noticeContracts Finder
  3. 31 Jul 2026Contract starts
  4. 11 Sep 2026Contract ends

How it compares

With every heat pumps award since 2021

Half of awards fall between £90,190 and £804,689Median £257,816

Awards
297
Firms that won them
189
Median award
£257,816
of 278 with a value
This award
Bigger than 51%
of them
Typical length
5 months
In South West
34 awards

ZLC Energy ranks 55th of 189 firms for heat pumps awards since 2021.

RankFirmAwardsValue
1Locked9£10.4m
2Locked8£30.7m
3Locked7£15.4m
4Locked6£2.2m
4Locked6£1.53m
4Locked6£1.44m
55ZLC Energy Won this one1£270,000
See who wins this work

Figures to 25 November 2026

Heat pumps at other buyers

Falmouth Exeter Plus has awarded 37 contracts since 2021.

See Falmouth Exeter Plus's page
  • ZLC Energy has won 10 public contracts since 2021.