Timber cladding remedial works: Galeri Caernarfon seeks a contractor
Galeri Caernarfon Cyf wants a contractor to repair the timber cladding on its building at Doc Victoria, Caernarfon. The aim is to fix defects in the façade, keep weather out and make the cladding last longer.
The contractor would take the boards down in sections, store them and refit them, with about 80% expected to be reused. New boards would go in only where old ones are unfit. Behind them, the breather membrane would be replaced and decayed battens swapped for new treated ones. All faulty fixings would give way to marine-grade A4 / Grade 316 stainless steel. Above the stage doors, new cladding would get a capping piece with a drip detail.
Galeri has published no estimate. The deadline for bids is 20 November 2026.
Closed 20 Nov 2026
- What
- External wall cladding replacement and overcladding
- Estimated value
- Not published
- How it is being bought
- Not published
- Bids due
- 20 Nov 2026
- Contract dates
- Not published