Montel takes on Rushmire Hill road repair and the Standish path
- Gloucestershire County Council
- South West
- Open procedure
- 6 January 2025 to 30 May 2025
Gloucestershire County Council hired Montel Civil Engineering, a small business, to stabilise the B4058 at Rushmire Hill and build a path near Standish.
At Rushmire Hill, near Wotton-under-Edge, ground movement had long damaged the B4058. Montel was to drive sheet piles along about 255m of council-owned verge, rebuild 280m of the northbound carriageway and install three inclinometers as part of a ground investigation.
The Standish path was to be 400m long and 3m wide, for shared use and as a bridleway, running from the Horsemarling Lane roundabout to the Blackbridge access track. It formed part of the council's plan for the Gloucestershire Cycle Spine, to boost active travel across the county. The council awarded the work after an open tender. The £1.7m contract ran from January 2025 and was due to end in May 2025.
- What
- Retaining walls, slope stabilisation and land hazard works
- Supplier
- Montel Civil Engineering
- Value
- £1.74m
- How it was bought
- Open procedure
- Dates and next
- Jan 2025 to May 2025