Contract awardedSolar PV and battery storage

Carbon3 chosen for solar PV at Wigan Community Fire and Ambulance Station

Greater Manchester Combined Authority (GMCA) chose Carbon3 Ltd, a small business, to add solar PV at Wigan Community Fire and Ambulance Station. A low carbon feasibility survey had found the building might benefit from more solar PV alongside its existing system, and from battery storage.

Great British Energy funded the scheme through the Mayoral Renewables Fund, on condition it was fully finished by 31 March 2026. The work came in stages. Carbon3 first had to survey the roof and check its structure, then design the system. GMCA could stop after either stage, and could choose the solar PV alone or add the battery.

GMCA ran a further competition through the NHS SBS Decarbonisation of Estates Framework (SBS10504). The design and build contract was worth £74,695.

What
Solar PV and battery storage
Supplier
Carbon3 Ltd
Value
£74,695
How it was bought
Call-off from a framework agreement
Dates and next
Jan 2026 to Mar 2026

How it was bought

1 official notice
  1. 14 Jan 2026Contract starts
  2. 9 Mar 2026Award noticeContracts Finder
  3. 31 Mar 2026Contract ends

Greater Manchester Combined Authority has bought this 10 times since 2021

Last bought
Jan 2026
Typical length
4 months
Typical value
£356,092
Suppliers used
14
AwardedContractWon byValue
Jan 2026This purchase3 monthsCarbon3 Ltd£74,695
Nov 2025Locked5 monthsLocked£845,900
Jan 2025Locked3 monthsLocked£161,878
Jun 2024Locked11 monthsLocked£899,700
May 2023Locked4 monthsLocked£224,040

and 5 more

Suppliers Greater Manchester Combined Authority has used

SupplierContractsValue
Locked3·
Locked3·
Locked2·
Locked2·
Carbon3 Ltd Won this one1£74,695

and 9 more

See the contracts and who won them

Figures to 25 November 2026

How it compares

With every solar PV and battery storage award since 2021

Half of awards fall between £68,459 and £577,500Median £185,829

Awards
737
Firms that won them
377
Median award
£185,829
of 672 with a value
This award
Smaller than 73%
of them
Typical length
5 months
In North West
55 awards

Carbon3 Ltd ranks 22nd of 377 firms for solar PV and battery storage awards since 2021.

RankFirmAwardsValue
1Locked24£5.53m
2Locked15£2.78m
3Locked14£39m
4Locked13£5.23m
5Locked12£2.41m
5Locked12£1.91m
22Carbon3 Ltd Won this one6£1.27m
See who wins this work

Solar PV and battery storage at other buyers

Greater Manchester Combined Authority has awarded 677 contracts since 2021.

See Greater Manchester Combined Authority's page
  • Carbon3 Ltd has won 7 public contracts since 2021.

4 solar PV and battery storage tenders are open now

See them
More solar PV and battery storage contracts awarded in 2026