GPF Lewis carries out works to Guy's Hospital theatres 1 and 2
- Guy's and St Thomas' NHS Foundation Trust
- London
- Direct
- 1 July 2025 to 31 December 2025
GPF Lewis carried out enhanced minor works and maintenance to Theatres 1 and 2 for Guy's and St Thomas' NHS Foundation Trust.
The two operating theatres sit on the first floor of the Borough Wing at Guy's Hospital in London. GPF Lewis was the main construction contractor, working inside an active hospital to healthcare building standards.
The trust awarded the £2.4m contract directly. It was due to run to December 2025 but ended in October 2025.
- What
- Laboratory and specialist room refurbishment
- Supplier
- GPF Lewis PLC
- Value
- £2.38m
- How it was bought
- Direct
- Dates and next
- Jul 2025 to Dec 2025