Lysons Enterprise Estate refurbishment planned by Guildford Borough Council
- Guildford Borough Council
- South East
- 31 January 2027 to 31 December 2028
Guildford Borough Council plans to refurbish the light industrial units at Lysons Enterprise Estate, built in the 1980s. The units fail the Minimum Energy Efficiency Standards, and the council wants the estate to reach an EPC rating of A.
The units sit in three steel-framed terraces on a site of 4,611 sq m. The works are likely to include recladding the terraces, new doors and windows, and PV panels only where needed to reach EPC A.
Under a pre-construction services agreement, a contractor would first develop the design, carry out surveys, prepare the planning application and price the works on an open-book basis. If that stage succeeds, the council may award the same firm a design and build contract. Contractors were asked to express interest by 9 October 2026, and no estimate has been published.
- What
- Building refurbishment, remodelling and conversion
- Estimated value
- Not published
- How it will be bought
- Not published
- Responses due
- 9 Oct 2026
- Contract dates
- Jan 2027 to Dec 2028