Stoke Newington Town Hall refurbishment design goes to HP Architects
- London Borough of Hackney
- London
- Call-off
- 14 October 2026 to 31 August 2029
The London Borough of Hackney appointed HP Architects Ltd to design the refurbishment of Stoke Newington Town Hall.
HP Architects, a small business, provides both the architectural and the engineering design. The council placed the order directly with the firm under Lot 1 of Hackney's Professional Consultancy Services Framework, without a further competition.
The award was £1.4m. The contract started in October 2026 and is due to end in August 2029.
Contract ends August 2029
- What
- Multidisciplinary design team
- Supplier
- HP Architects Ltd
- Value
- £1.42m
- How it was bought
- Call-off, London Borough of Hackney
- Dates and next
- Oct 2026 to Aug 2029