Salnor Roofing refurbishes the Lakeside Quiet Area roof at Swanwick Lodge
- Hampshire County Council
- South East
- Call-off
- 12 October 2026 to 30 October 2026
Hampshire County Council ordered a roof refurbishment over the Lakeside Quiet Area at Swanwick Lodge Secure Unit from Salnor Roofing Services Limited, a small business.
The whole flat roof was to get a Bauder PMMA liquid-applied waterproof membrane. At the front, about 1.5m that drained back into an internal box gutter was to be re-laid to fall to the perimeter, with new fascia, soffit, rainwater goods and underground storm drainage.
The council ordered the £31,384 job through its Minor Works Framework 2026-2030. The work was due to run through October 2026.
- What
- Flat roofing
- Supplier
- Salnor Roofing Services Limited
- Value
- £31,384
- How it was bought
- Call-off, Minor Works Framework 2026-2030
- Dates and next
- Oct 2026 to Oct 2026