Alexandra Palace Great Hall Bridge: Haringey wants waterproofing works
- London Borough of Haringey
- London
- 22 January 2027 to 30 April 2027
The London Borough of Haringey wants a contractor to bring the Great Hall Bridge at Alexandra Palace back into use. The works would improve its waterproofing and bring it up to Building Regulations.
Once done, the public could use the bridge to reach the Great Hall, an events venue at the Palace. It would also serve as a means of escape, so safety comes first. The contractor must fit the works around the bridge's structure and building services without harming the listed fabric. Public events should face as little disruption as possible, and life-safety systems and the venue must keep working throughout.
The works are estimated at £850,000. The deadline for bids is 27 November 2026, and the contract is due to run for three months from January 2027.
Closes in 5 days· 27 Nov 2026
- What
- Building refurbishment, remodelling and conversion
- Estimated value
- £850,000
- How it is being bought
- Not published
- Bids due
- 27 Nov 2026
- Contract dates
- Jan 2027 to Apr 2027