DCK Construction refurbishes six void homes for Haringey
- London Borough of Haringey
- London
- Call-off, 5 bids
London Borough of Haringey ordered a second phase of refurbishment for its void properties, covering six homes.
Inside, the homes were to get new heating, kitchens and bathrooms, with rewiring and redecoration. Outside, the contractor was to renew or repair roofs, windows and rainwater goods.
The council ordered the work through the London Construction Programme Major Works Housing Framework MW24-H. Five bids came in, scored 50% on quality, 40% on price and 10% on social value. DCK Construction, a small business, won at £1.03m.
- What
- Void property works
- Supplier
- DCK Construction Limited
- Value
- £1.03m
- How it was bought
- Call-off, LCP Major Works Housing
- 5 bids
- Dates and next
- 9 Feb 2026