Bannister Athletic Track: Harrow plans to replace the track surface
- London Borough of Harrow
- London
- 29 June 2027 to 1 October 2027
London Borough of Harrow plans to refurbish the Bannister Athletic Track, which elite athletes use. It wants the synthetic surface replaced, the base beneath repaired and the track recertified to UK Athletics TrackMark standards.
The work would include localised macadam repairs, possibly over about 800m², and about 100 linear metres of new kerbing. Drainage channels would be refurbished and a World Athletics-certified porous polymeric track laid. Awarding the contract depends on funding the council has applied for from London Marathon Funding. The council started the process early so the work can fit a 12-week window in summer 2027.
The council asked suppliers about timing, risk, who designs what, the form of contract and likely cost. It proposes an open procedure and has published no estimate.
Due in 19 days· 11 Dec 2026
- What
- Synthetic sports pitches, MUGAs and outdoor sports surfaces
- Estimated value
- Not published
- How it will be bought
- Not published
- Responses due
- 11 Dec 2026
- Contract dates
- Jun 2027 to Oct 2027