Allies and Morrison is drawing up the Harrow Town Centre Masterplan for the London Borough of Harrow.
The masterplan will give design guidance for future regeneration in the town centre, based on stakeholder engagement and analysis of the area.
The borough chose the firm after a limited competition. The £100,132 contract runs to April 2027, and a six-month extension could take it to October 2027.
Contract ends April 2027
- What
- Masterplanning, urban design and design codes
- Supplier
- Allies and Morrison
- Value
- £100,132
- How it was bought
- Below threshold - limited competition
- Dates and next
- Jan 2026 to Apr 2027