Heart Academies Trust hired FM4U, a small business, to turn an unused Redgra surface at Abbey Grange CofE Academy into a full-size grass football pitch. The old surface had become overgrown.
The firm was to design the pitch, price it and set out a schedule for installing it. The area had to be dug out and the spoil removed, then given a new subbase, topsoil and seed suited to football and rugby. Drainage formed part of the design so the pitch could be played on all year.
The trust ordered the work through a dynamic purchasing system. The £264,628 contract ran from June 2025 and was due to end in May 2026.
- What
- Pitch drainage and construction
- Supplier
- FM4U
- Value
- £264,628
- How it was bought
- Call-off from a dynamic purchasing system
- Dates and next
- Jun 2025 to May 2026