Uxbridge legibility strategy for Hillingdon comes from Maynard Design
- London Borough of Hillingdon
- London
- Below threshold - open competition
- 4 May 2026 to 21 August 2026
The London Borough of Hillingdon hired Maynard Design Consultancy Limited to draw up a legibility strategy for Uxbridge and the Civic Centre forecourt.
The aim was signage and wayfinding that would help residents and visitors find their way. The Civic Centre campus, home to the library, registrars office and archives, came first, though only its outside areas. Uxbridge Town Centre came second. Each needed a concept design and a detailed design. The UKSPF paid for the commission. Quality counted for 60% of the score and price for 40%.
Maynard won the £59,637 contract after an open tender. The work ran from May 2026 and was due to end in August 2026.
- What
- Wayfinding strategy, design and signage
- Value
- £59,637
- How it was bought
- Below threshold - open competition
- Dates and next
- May 2026 to Aug 2026