Pond dipping platform at York's Millennium Green comes from Groundwork
- Homes England
- Yorkshire and the Humber
- Direct
- 1 April 2026 to 30 April 2026
Homes England wanted a pond dipping platform built on the Millennium Green, beside the York Central development site.
The job covered site preparation, a timber structure and safety handrails. The builder had to protect the pond's ecosystem and work within limits on access to the green.
Homes England awarded the £24,999 contract directly to Groundwork Yorkshire, which was to supply and install the platform in April 2026.
- What
- Recreational trails, boardwalks and countryside path building
- Buyer
- Homes England
- Supplier
- Groundwork Yorkshire
- Value
- £24,999
- How it was bought
- Direct
- Dates and next
- Apr 2026 to Apr 2026