Tunnel and lineside M&E systems for HS2 go to Costain
- HS2
- Competitive procedure with negotiation (above threshold), 4 bids
- 3 February 2025 to 26 August 2032
Costain Limited will deliver and then maintain the mechanical and electrical (M&E) systems in HS2's tunnels and along its open route. In the tunnels that covers the shafts, portal buildings and cross-passages.
Long tunnels will be ventilated mainly by large axial fans set in shafts, and shorter tunnels by jet fans. Other systems range from SCADA control and tunnel lighting to fire safety and low voltage power. On the open route, Costain fits points heating and junction lighting. The separate Cross Package Doors contract moves into this one, and Costain will help HS2 buy later maintenance from the original equipment makers.
HS2 received four bids in a negotiated competition, with technical merit weighted at 70% after a pass or fail compliance check. The £408,545,166 contract started in February 2025 and runs to August 2032.
Contract ends August 2032
- What
- Combined M&E building services installation
- Buyer
- HS2
- Supplier
- Costain Limited
- Value
- £408.5m
- How it was bought
- Competitive procedure with negotiation (above threshold)
- 4 bids
- Dates and next
- Feb 2025 to Aug 2032