Humber Bridge roller shutter joints are maintained by 3RS Engineering
- Humber Bridge Board
- Yorkshire and the Humber
- Below threshold - without competition
- 5 September 2026 to 3 September 2029
Humber Bridge Board hired 3RS Engineering to inspect and maintain the refurbished DEMAG roller shutter joints on the Humber Bridge.
The board supplies the new parts itself. 3RS Engineering takes the joints out, swaps any damaged parts and refits them, working over a weekend shift.
The £133,280 contract was awarded directly, without a competition. It runs for three years from September 2026, and an extension could take it to September 2032.
Contract ends September 2029
- What
- Bridges and highway structures
- Buyer
- Humber Bridge Board
- Supplier
- 3RS Engineering Limited
- Value
- £133,280
- How it was bought
- Below threshold - without competition
- Dates and next
- Sep 2026 to Sep 2029
- Option to Sep 2032