R92 beach steps on the Isle of Wight rebuilt by Opex Groundworks
- Isle of Wight Council
- South East
- RFQ
- 28 September 2026 to 26 October 2026
Isle of Wight Council hired Opex Groundworks and Civil Engineering to rebuild the beach access steps on footpath R92.
The steps sit on the England Coastal Path. The job was a one-month piece of civil engineering.
The council asked for quotes rather than running an open tender, and awarded the £9,050 contract in September 2026. The work was due to end in October 2026.
- What
- Public rights of way and countryside access maintenance
- Value
- £9,050
- How it was bought
- RFQ
- Dates and next
- Sep 2026 to Oct 2026