Capital Property surveys Harvist Estate towers for Islington fire reports
- London Borough of Islington
- Below threshold - without competition
- 8 December 2025 to 3 February 2026
The London Borough of Islington hired Capital Property & Construction Consultancy Ltd to survey four high-rise blocks on the Harvist Estate.
The consultancy carried out inspections and destructive surveys of the buildings. Its findings supported a fire engineer preparing a Fire Risk Appraisal of External Walls (FRAEW) and an EWS1 certificate for each of the four blocks. The work was part of major works on the estate.
The consultancy, a small business, was awarded the £39,881 contract directly. The work ran from December 2025 and ended in February 2026.
- What
- External wall fire risk appraisals (FRAEW and EWS1)
- Value
- £39,881
- How it was bought
- Below threshold - without competition
- Dates and next
- Dec 2025 to Feb 2026