Carmelcrest wins design and build of IWM Duxford's fire engine shed
- Imperial War Museums
- East of England
- Open, 14 bids
- 12 January 2026 to 17 July 2026
Imperial War Museums hired Carmelcrest Ltd, a small business, to design and build a new fire engine shed at IWM Duxford.
The shed was to sit next to the Air Traffic Control (ATC) Tower, physically separate from it and no taller or larger in footprint. It also had to leave views from the Visual Control Room unblocked. Inside, it was to house three fire vehicles alongside a watch room for CCTV, decontamination showers and a breathing apparatus room. The design was to be plain and hard-wearing, with heritage touches and colours that suit the historic buildings nearby.
Carmelcrest won the £698,635 contract from 14 bids. Technical answers made up 50% of the score, cost 40% and a presentation 10%. Work ran from January 2026 and was due to finish in July 2026.
- What
- New-build construction of non-residential buildings
- Buyer
- Imperial War Museums
- Supplier
- Carmelcrest Ltd
- Value
- £698,635
- How it was bought
- Open
- 14 bids
- Dates and next
- Jan 2026 to Jul 2026